For your business · Solar

Commercial solar designed from your load profile

Businesses use most of their power while the sun is up. We design from your interval data and roof, plan around your operations and stage the work where capital budgets need it.

Long rows of solar panels on an industrial metal roof under a cloudy sky

Your question

“How much of our daytime load can solar cover, and how do we deliver it without disrupting the site?”

Commercial sites often use most of their electricity during working hours, which suits solar well. The design starts from your interval data, roof structure and switchboard capacity, and from how the site operates, including shutdown windows.

This usually fits when

  • High electricity use during business hours
  • A large roof that is not earning anything
  • Capital budgets that suit a staged installation
  • Sustainability targets that need documented generation

Sizing

What the design depends on

These are the inputs we check before recommending a size. Numbers in your proposal are labelled as kW (power), kWh (energy) or estimate.

Interval data
Half-hourly consumption shows how much daytime load solar can cover and how much would be exported.
Roof structure and condition
Load capacity, membrane or sheet type, and whether remediation is needed first.
Main switchboard and network
Capacity, protection and the network’s connection requirements for larger systems.
Operations
Access, shutdown windows, tenants and safety requirements shape the programme.
System size thresholds
Incentive rules differ by system size; we check the current thresholds when we design.
kW
Power: panel, inverter or charger size
kWh
Energy: stored in a battery or produced over time
Estimate
Calculated before or during design, not measured
Measured
Read from monitoring or meter data

Scope

What is included, and what depends on the site

Included

  • Feasibility review from interval data or bills
  • Engineering design and equipment selection
  • Programme planned around operations, including after-hours work
  • Installation, commissioning and network approvals
  • Monitoring from day one

Depends on the assessment

  • Roof remediation
  • Main switchboard upgrades
  • Structural assessment
  • Network studies for larger systems
  • Payment options

Want to know what this looks like for your property?

Commercial & industrial

Manufacturing facility · NSW

Feasibility first, then a staged commercial solar plan

A feasibility study set the system size, roof remediation came first, and installation was staged to the client’s quarterly capital budget.

  • kW 100 kW
  • kW Sungrow 100 kW
Health, heritage & community

Public hospital · Westmead, NSW

Hospital solar on a live site in Westmead

Lightweight panels on a non-penetrative system protected the waterproof membrane of a hospital roof while the hospital kept operating.

  • kW 380 kW DC
  • kW 300 kW AC

Steps

How the work runs

  1. Site and data review

    Interval data or bills, roof drawings, switchboard capacity and how the site operates through the day and week.

  2. Feasibility and design

    System options sized to the load profile and roof, with the assumptions behind any generation or savings estimate stated in writing.

  3. Proposal and staging

    Scope, programme and, where it helps the budget, a staged plan. Shutdowns are planned around your operations.

  4. Delivery

    Project managers, engineers and electricians coordinate access, safety, installation, commissioning and network approvals.

  5. Monitoring and support

    Monitoring set up from day one, and maintenance or fault response when the site needs it.

Commercial solar: questions

Can we install without shutting down the site?

Most of the work happens on the roof while the site runs. The connection needs short planned shutdowns, which we schedule out of hours where needed. On our staged commercial case study, shutdowns were scheduled after hours.

Can the project be staged?

Yes. A feasibility study can set the final size and a staged plan that follows your capital budget, as on our staged commercial case study.

Will the system run during a blackout?

A grid-connected system shuts down during an outage. Keeping selected loads running needs battery storage with backup capability, designed for those loads.

What data do you need?

Twelve months of bills, or interval (NMI) data from your retailer, roof drawings if available, and switchboard details. We can request the data with your authorisation.

Free quote · Commercial solar

Tell us about your property and what you want to achieve

Send a few basic details. Neo reviews what you need and comes back to you by phone or email to discuss it and, where needed, arrange an assessment.

What happens next

  1. We review your detailsYour property, usage and goals.
  2. We contact youBy the phone or email you give us, to ask what we still need.
  3. Assessment and written proposalSizes in kW and kWh, scope, and what depends on the site.

Request your free quote

Phone or email: give at least one.

Is this for a home or a business?
Selected from the page you came from. You can change it.
For example: “we export most of our solar and want a battery”, or “generation dropped after the summer”.

Have a recent electricity bill or photos of your switchboard? They help us size the system. We will tell you how to send them when we reply.

We use these details only to respond to your enquiry and prepare a quote. See our privacy policy.