For your business · EV charging

EV charging that your site’s supply can carry

Fleet, staff, visitor or residential charging: we size the chargers and load management to the site’s supply, so adding cars does not mean an unplanned upgrade.

Wall-mounted EV charger with its cable coiled on a holder, on a brick wall

Your question

“How many chargers can our site support, and who pays for the power?”

The number and power of chargers a site can support depends on spare supply capacity and how charging is shared across the day. Load management lets more chargers share the same supply; metering and access control decide who pays.

This usually fits when

  • Electrifying a vehicle fleet
  • Staff or visitor parking
  • Apartment or strata car parks
  • Pairing chargers with on-site solar

Sizing

What the design depends on

These are the inputs we check before recommending a size. Numbers in your proposal are labelled as kW (power), kWh (energy) or estimate.

Spare supply capacity
Maximum demand and switchboard capacity limit the total charging power available.
Vehicles and dwell time
How many cars, how far they drive and how long they stay parked.
Load management
Sharing available power between chargers instead of sizing for all at full power.
Billing and access
Metering, user accounts or cost recovery for staff, visitors or residents.
kW
Power: panel, inverter or charger size
kWh
Energy: stored in a battery or produced over time
Estimate
Calculated before or during design, not measured
Measured
Read from monitoring or meter data

Scope

What is included, and what depends on the site

Included

  • Site supply and switchboard review
  • Charger and load-management design
  • Installation and commissioning
  • Charger software set-up

Depends on the assessment

  • Supply upgrades
  • Civil works and cable routes
  • Strata approvals
  • Billing platforms

Want to know what this looks like for your property?

We have not published a commercial EV charging case study yet. Ask us about comparable sites when you request an assessment.

See all case studies

Steps

How the work runs

  1. Site and data review

    Interval data or bills, roof drawings, switchboard capacity and how the site operates through the day and week.

  2. Feasibility and design

    System options sized to the load profile and roof, with the assumptions behind any generation or savings estimate stated in writing.

  3. Proposal and staging

    Scope, programme and, where it helps the budget, a staged plan. Shutdowns are planned around your operations.

  4. Delivery

    Project managers, engineers and electricians coordinate access, safety, installation, commissioning and network approvals.

  5. Monitoring and support

    Monitoring set up from day one, and maintenance or fault response when the site needs it.

Commercial EV charging: questions

Do we need a supply upgrade for several chargers?

Not always. Load management can share the existing capacity between chargers. A supply review shows how far that goes before an upgrade is needed.

Can chargers use our solar?

Yes, where the chargers and energy management system support it and the cars are parked during the day.

Can residents in a strata building pay for their own charging?

Yes, with metered chargers or a billing platform. The owners corporation usually needs to approve the installation first.

Free quote · Commercial EV charging

Tell us about your property and what you want to achieve

Send a few basic details. Neo reviews what you need and comes back to you by phone or email to discuss it and, where needed, arrange an assessment.

What happens next

  1. We review your detailsYour property, usage and goals.
  2. We contact youBy the phone or email you give us, to ask what we still need.
  3. Assessment and written proposalSizes in kW and kWh, scope, and what depends on the site.

Request your free quote

Phone or email: give at least one.

Is this for a home or a business?
Selected from the page you came from. You can change it.
For example: “we export most of our solar and want a battery”, or “generation dropped after the summer”.

Have a recent electricity bill or photos of your switchboard? They help us size the system. We will tell you how to send them when we reply.

We use these details only to respond to your enquiry and prepare a quote. See our privacy policy.